Green Mountain

Project: Install two distribution tunnels.

Company: Green Mountain- Keurig Coffee Company

Description: We were contracted to off load, transport through the plant, stand, and set in place two distribution tunnels which weighed almost 25,000 pounds and roughly 24' long.  

We used our Hoist 40/60 rigging lift with the rigging boom and a 15,000 pound lift with a rigging boom also. 

keurig01.jpg keurig02.jpg keurig03.JPG keurig04.JPG  keurig06.JPGkeurig07.jpg keurig05.jpeg